Structured cabling
Eighteen Cat6 drops coordinated with the new-office layout.
Project profile for an Irvine office buildout with Cat6 cabling, controlled doors, MDF work, Meraki activation and technology relocation.

The Suite 950 deployment combined 18 Cat6 drops, two controlled doors, MDF rack and patching work, access-point support, Meraki equipment activation assistance and display relocation. Field conditions included missing carrier equipment, hard-lid access and building restrictions on door-frame modifications.
Eighteen Cat6 drops coordinated with the new-office layout.
Two doors required hardware decisions consistent with frame and building constraints.
Customer-furnished Meraki firewall, switch and access points required activation coordination.
MDF, access points, displays, carrier readiness and trades converged on one schedule.
Hard-lid ceilings, access hatches and restricted frame cuts affected constructability.
Activation, licensing and missing carrier hardware required clear responsibility.
Reader and platform selection could not replace a complete opening survey.
This profile identifies the engagement status shown above. It does not claim unmeasured results, completed construction beyond the stated scope, or work not awarded to Terapixels.
We will help turn them into a defined, supportable scope.